New FGI Guidelines Turn Down the Volume on Health Care Acoustics
The 2010 FGI Guidelines for Design and Construction of Health Care Facilities was published in January and adopted as building code by many states. How will you deal with the new noise, privacy, and acoustical requirements for healthcare facilities? Join us at SoundHealthcare 2010, a Health Care Acoustics Training Seminar, and find out what you must know about the new FGI Guidelines for HIPAA Compliance and LEED HC. The new guidelines are the culmination of over five years of collaborative work by researchers, architects, engineers, and acoustical consultants to solve the problems of speech privacy and excessive noise in hospitals. The guidelines are effective immediately for the design of all healthcare facilities. For perspective, consider the 2006 Guidelines which mandated single patient rooms in hospitals. As a result, single patient rooms are the absolute standard in healthcare design today. This was an overnight seismic shift in policy that affected all healthcare building projects. Well, the 2010 Guidelines are no different in their sweeping reforms, addressing a whole new dimension of healthcare design, namely: acoustics, noise, and HIPAA speech privacy laws. (more)
Tunnel Vision | Highway Traffic Noise Wall Barriers
On a recent trip to Chicago, my wife and I were thankful for all the new traffic lanes recently completed. I can remember when the trip back home to my folks took an extra couple of hours if I got stuck in all the traffic. But thankfully, with the new highway renovations, we’ve actually had some easy trips with no more traffic backups. Of course, our easy traveling must come at a cost. High density population areas are often encroached upon by the infrastructure needed to support them. In our case, the highways got a lot bigger with more lanes but that meant that they were even closer to the houses and neighborhoods that we drove through. (more)
Commissioning Audio-Visual Systems | Why it’s Essential
This past summer I went to commission a small sound system at a new facility. Not necessarily a big expensive project, but the client had hired us to commission the final installation and make sure everything was installed as specified. I showed up on site, confirmed all of the equipment was installed and then proceeded to check out how the wiring had been installed. At first everything looked pretty good, until I pulled one of the microphone input plates off the wall and discovered that there was no junction box behind it. Instead someone had busted a hole in the masonry block and tried to fish the wires down through the block from above. But they had run into a little problem at the steel beam. So they made another hole through the vapor barrier and ran the wires just inside the exterior brick. Problem solved, right? Uh… not so much. (more)
Subscribe via email
Enter your email address
Delivered
by FeedBurner